BATTERSEA POWER STATION – Phase 1 & 2 Contractor: Skanksa/Mace Architect:WilkinsonEyre Value: £50m Engineer: Robert Bird Group Restoration of the iconic wash towers Primary scope of works was within the four washtowers RC Liner Walls to form new envelope structure RC Liner Shotcrete and traditional formwork Basement demolition and removal of large existing girder steels New RC staircase walls threaded around existing steel girders New structural steel floors and metal decking New exposed steelwork lift shaft including 40m vertical Structural steel to brace new openings in brickwork walls Temporary transfer grillages at upper ground levels Modifications to the existing structural steel work Installation 900 tonne of structural steelwork including all detailing and connection design