BATTERSEA POWER STATION – Phase 1 & 2

Contractor: Skanksa/Mace               Architect:WilkinsonEyre

Value: £50m                                           Engineer: Robert Bird Group

  • Restoration of the iconic wash towers
  • Primary scope of works was within the four washtowers
  • RC Liner Walls to form new envelope structure
  • RC Liner Shotcrete and traditional formwork
  • Basement demolition and removal of large existing girder steels
  • New RC staircase walls threaded around existing steel girders
  • New structural steel floors and metal decking
  • New exposed steelwork lift shaft including 40m vertical
  • Structural steel to brace new openings in brickwork walls
  • Temporary transfer grillages at upper ground levels
  • Modifications to the existing structural steel work
  • Installation 900 tonne of structural steelwork including all detailing and             connection design