HS2 – OLD OAK COMMON (RETAINING WALL) Posted 22nd August 2024 Client: BBVS (Balfour Beatty, Vinci, Systra) Value: £7m SSE Substation Retaining wall section -Install pile mat, piles, ground anchors and construct… Read more »
HS2 – OLD OAK COMMON (GUIDEWALL & WORKING PLATFORMS) Posted 22nd August 2024 Client: SB3 (Balfour Beatty Ground Engineering & Bachy Soletanche) Value: £11.2m • 100.000t of stone import and Construct Pile Matt over 7 working Zones • 1.8k of Guidewall Construction,… Read more »
MOD Site – West London Posted 22nd August 2024 Client: Balfour Beatty Value: £25m Sub structure foundations – Pile Caps, Ground beams & lift pit cores to SW, EW, OW,… Read more »
MOD Site – West London Posted 22nd August 2024 Client: Costain Value: £9m External Works Fence Easement Clearance Undertake the earthworks to the internal elements of the facility … Read more »
FAS BARNES Posted 22nd August 2024 Client: Balfour Beatty (TEAM 2100) Value: £500k Full upgrade of the White Hart Lane and Elm Park culverts Reinforced concrete beams and slabs. Increased footpath widths Reinstatement of river stone… Read more »
TILBURY DOCKS Posted 22nd August 2024 Client: Balfour Beatty (TEAM 2100) Value: £8m Enabling Works (site clearance, service diversions, abandonment of redundant service routes) Machine House Foundations Ducting and Service Connections Flood Walls and Walkway Structure… Read more »
CANVEY ISLAND Posted 22nd August 2024 Client: Balfour Beatty (TEAM 2100) Value: £12m Groundworks Construction of 20 No Passing Places Construction of 17 Foreshore Access Steps Localised reinstatement of Maintenance track slab. Demolition of existing and… Read more »
HS2 – COLNE VALLEY VIADUCT Posted 22nd August 2024 Client: ALIGN JV (Bouygues Travaux Publics, VolkerFitzpartick & Sir Robert McAlpine) Value: £9m Cast in situ, reinforced Robust Kerb. Installation of an Ultra High-Performance Concrete (UHPC) Parapet. Installation of… Read more »
IVER CONTACT TANK Posted 22nd August 2024 Client: Three Valleys Water Value: £4.5m • Pipework and valves to allow the entire forward flow to the contact tanks to be diverted back to the works… Read more »
HS2 – ASSEST PROTECTION AND MITIGATION FRAMEWORK Posted 22nd August 2024 Client: SCS JV (Skanska, Costain and STRABAG JV) Bridge Jacking and Bearing Replacement Masonry/Brickwork/Stonework reinstatement/making good and repointing… Read more »
COLINDALE STATION Posted 22nd August 2024 Client: Morgan Sindall Value: £4m • Installation of hoardings & gates • Removal of Urban Realm items • Construct Crane Foundation • Install pad foundations for welfare. • East… Read more »
CROSSRAIL EAST (ANGLIA) – LINE OF ROUTE AND STATIONS Posted 29th May 2020 Client: Costain Value: £24m Location: Crossrail East Duration: 3 years We undertook major infrastructure improvement works to upgrade the existing line of route, railway systems and civil support for overhead… Read more »
CROSSRAIL – WEST DRAYTON STATION Posted 29th May 2020 Contractor: Hochtief Value: £1.7m Groundworks • Pile excavation and breakdown for northern staircase and footbridge. • Excavation, temporary works, and reinforced concrete works for lift pit, … Read more »
CROSSRAIL – PLUMSTEAD MAINTENANCE FACILITY & URBAN REALM Posted 29th May 2020 Client: ATC Value: £17m • Neatly saw cutting of road / pavement surfacing. • Trench excavation for the cable laying duct installation works was carried out… Read more »
TFL OLD STREET ROUNDABOUT Posted 29th May 2020 Client: Morgan Sindall Value: £15.5m Enabling works Drainage, connections, and diversions RC walls, Structural Alterations & New Capping Slab creating a portal … Read more »
STOKE GIFFORD Posted 29th May 2020 Client: Volker Fitzpatrick Value: £1.9m Location: Stoke Gifford Bristol Duration: 32 weeks Extensive civils works were carried out to provide 300,000 litres of additional fuel storage capacity at Stoke Gifford… Read more »
TFL HIGHWAYS Posted 29th May 2020 Client: Hochtief Value: £1.6m Location: Highbury Corner Duration: 6 months At Highbury Corner, Islington a challenging project in terms of live traffic, logistics and rail environment was undertaken in compliance… Read more »
CROSSRAIL WESTERN STATIONS Posted 29th May 2020 Client: Vinci Construction UK Value: £2.9m Location: Ealing Broadway, Hanwell, Southall and Iver Duration: 16 months This civil engineering package was part of the Crossrail West Station Upgrade Works at… Read more »
DLR – ROYAL MINT GARDENS Posted 23rd January 2020 Client: IJM Value: £8.8m • Full electrical and mechanical installation along the full length of the 150m tunnel. • Fire Main installed along the 150m Tunnel. • Two… Read more »