CROSSRAIL EAST (ANGLIA) – LINE OF ROUTE AND STATIONS Posted 29th May 2020 Client: Costain Value: £24m Location: Crossrail East Duration: 3 years We undertook major infrastructure improvement works to upgrade the existing line of route, railway systems and civil support for overhead… Read more »
CROSSRAIL – WEST DRAYTON STATION Posted 29th May 2020 Contractor: Hochtief Value: £1.7m Groundworks • Pile excavation and breakdown for northern staircase and footbridge. • Excavation, temporary works, and reinforced concrete works for lift pit, … Read more »
CROSSRAIL – PLUMSTEAD MAINTENANCE FACILITY & URBAN REALM Posted 29th May 2020 Client: ATC Value: £17m • Neatly saw cutting of road / pavement surfacing. • Trench excavation for the cable laying duct installation works was carried out… Read more »
TFL OLD STREET ROUNDABOUT Posted 29th May 2020 Client: Morgan Sindall Value: £3.9m Location: Old Street Duration: Ongoing At Old Street roundabout, we are carrying out works to the station entrances and traffic islands. This includes the excavation… Read more »
STOKE GIFFORD Posted 29th May 2020 Client: Volker Fitzpatrick Value: £1.9m Location: Stoke Gifford Bristol Duration: 32 weeks Extensive civils works were carried out to provide 300,000 litres of additional fuel storage capacity at Stoke Gifford… Read more »
TFL HIGHWAYS Posted 29th May 2020 Client: Hochtief Value: £1.6m Location: Highbury Corner Duration: 6 months At Highbury Corner, Islington a challenging project in terms of live traffic, logistics and rail environment was undertaken in compliance… Read more »
CROSSRAIL WESTERN STATIONS Posted 29th May 2020 Client: Vinci Construction UK Value: £2.9m Location: Ealing Broadway, Hanwell, Southall and Iver Duration: 16 months This civil engineering package was part of the Crossrail West Station Upgrade Works at… Read more »
DLR – ROYAL MINT GARDENS Posted 23rd January 2020 Client: IJM Value: £8.8m • Full electrical and mechanical installation along the full length of the 150m tunnel. • Fire Main installed along the 150m Tunnel. • Two… Read more »
BEACONSFIELD Posted 23rd November 2019 Client: Balfour Beatty Value: £1m Location: Beaconsfield Duration: 6 months The construction of the Eastern Relief Road at Beaconsfield included 1km of new road construction and roundabout to take traffic… Read more »