HS2 – OLD OAK COMMON (RETAINING WALL)

Client: BBVS (Balfour Beatty, Vinci, Systra) Value: £7m SSE Substation Retaining wall section -Install pile mat, piles, ground                     anchors and construct… Read more »

MOD Site – West London

Client: Balfour Beatty Value: £25m Sub structure foundations – Pile Caps, Ground beams & lift pit cores                    to SW, EW, OW,… Read more »

MOD Site – West London

Client: Costain Value: £9m   External Works Fence Easement Clearance Undertake the earthworks to the internal elements of the facility                     … Read more »

FAS BARNES

Client: Balfour Beatty (TEAM 2100) Value: £500k Full upgrade of the White Hart Lane and Elm Park culverts Reinforced concrete beams and slabs. Increased footpath widths Reinstatement of river stone… Read more »

TILBURY DOCKS

Client: Balfour Beatty (TEAM 2100) Value: £8m Enabling Works (site clearance, service diversions, abandonment of redundant service routes) Machine House Foundations Ducting and Service Connections Flood Walls and Walkway Structure… Read more »

CANVEY ISLAND

Client: Balfour Beatty (TEAM 2100) Value: £12m Groundworks Construction of 20 No Passing Places Construction of 17 Foreshore Access Steps Localised reinstatement of Maintenance track slab. Demolition of existing and… Read more »

HS2 – COLNE VALLEY VIADUCT

Client: ALIGN JV (Bouygues Travaux Publics, VolkerFitzpartick & Sir Robert McAlpine) Value: £9m   Cast in situ, reinforced Robust Kerb. Installation of an Ultra High-Performance Concrete (UHPC) Parapet. Installation of… Read more »

IVER CONTACT TANK

Client: Three Valleys Water Value: £4.5m   • Pipework and valves to allow the entire forward flow to the contact tanks to      be diverted back to the works… Read more »

COLINDALE STATION

Client: Morgan Sindall Value: £4m   • Installation of hoardings & gates • Removal of Urban Realm items • Construct Crane Foundation • Install pad foundations for welfare. • East… Read more »

CROSSRAIL – WEST DRAYTON STATION

Contractor: Hochtief  Value: £1.7m Groundworks • Pile excavation and breakdown for northern staircase and footbridge. • Excavation, temporary works, and reinforced concrete works for lift pit,           … Read more »

TFL OLD STREET ROUNDABOUT

Client: Morgan Sindall Value: £15.5m Enabling works Drainage, connections, and diversions RC walls, Structural Alterations & New Capping Slab creating a portal                 … Read more »

STOKE GIFFORD

Client: Volker Fitzpatrick Value: £1.9m Location: Stoke Gifford Bristol Duration: 32 weeks Extensive civils works were carried out to provide 300,000 litres of additional fuel storage capacity at Stoke Gifford… Read more »

TFL HIGHWAYS

Client: Hochtief Value: £1.6m Location: Highbury Corner Duration: 6 months At Highbury Corner, Islington a challenging project in terms of live traffic, logistics and rail environment was undertaken in compliance… Read more »

CROSSRAIL WESTERN STATIONS

Client: Vinci Construction UK Value: £2.9m Location: Ealing Broadway, Hanwell, Southall and Iver Duration: 16 months This civil engineering package was part of the Crossrail West Station Upgrade Works at… Read more »

READING STATION RENEWAL

Client: Costain/Hochtief                    Value: £6m                                   … Read more »

DLR – ROYAL MINT GARDENS

Client: IJM Value: £8.8m • Full electrical and mechanical installation along the full length of the 150m       tunnel. • Fire Main installed along the 150m Tunnel. • Two… Read more »